Skip to content

GE 7FA.03 7FA.04 Unit Rotor (New)

If your Frame 7FA rotor is approaching its service limit, secure worry-free operation with a brand-new 7FA rotor certified for up to 144,000 Factored Fired Hours (FFH) and 5,000 Factored Fired Starts (FFS). Reverse-engineered and refined by EthosEnergy’s turbine experts, the 7FA.03/.04 compressor and turbine rotors employ proven OEM designs and materials for peak reliability.

Category
Gas Turbines
Model
7FA.03/.04
OEM
General Electric

Equipment Specifications

If your 7FA gas turbine rotor is nearing end-of-life, upgrade to a brand-new assembly certified for 144,000 FFH and 5,000 FFS.

EthosEnergy’s gas turbine experts have reverse-engineered and enhanced the design using proven OEM materials and superior alloys for the Frame 7FA.03/.04 compressor and turbine rotors.

Each compressor rotor ships fully bladed and is interchangeable with 7FA.03/.04 flared units, while turbine rotors arrive bucket-less (with optional bucket installation on request) and match the Gen 4 enhanced-cooling-slot equivalent.

Dimensions: 28' 0" x 7' 6"

Approx. Shipping Weight: 96,000 lb (rotor); 10,000 lb (skid)

Title GE 7FA.03/7FA.04 Unit Rotor
Condition New
Total Running Hours 0
Expected Rotor Life (FFH) 144000
Warranty Type EcoLife
Place of Dispatch Houston, Texas, USA

Compressor Rotor

  • Fully bladed, balanced, and compatible with Frame 7FA.03/.04 units (subject to EthosEnergy engineering review).

  • Interchangeable with flared compressor rotors for these frames.

  • Fully inspected and balanced to prudent-industry standards.

  • Stages 12-17 compressor wheels redesigned per OEM TIL 1971/1972 to address field issues; wheels machined from proven alloys.

  • EthosEnergy-manufactured (or OEM-equivalent) round-bottom blades eliminate the need for spacers in stages R12-R17.

  • Optimal clocking and improved mesh order enhance performance and durability.

  • Individual bladed wheels are balanced before assembly; the full rotor is assembled in a state-of-the-art repair shop, with all quality certificates available on request.

  • Proprietary bi-layer coating applied to the stage 17 wheel for improved inner-barrel HPP-seal performance.

  • Applicable OEM TILs (1576, 1972, 1901, etc.) implemented; a summary is included in the detailed rotor-assembly report.

Turbine Rotor

  • Compatible with Frame 7FA.03/.04 units (subject to EthosEnergy engineering review) and supplied as Gen 4 design equivalent.

  • Stages 1-3 turbine wheels and 1-2/2-3 spacers engineered to resolve OEM-TIL issues.

  • Lock-wire-tab cracking and cooling-slot cracking addressed through improved design.

  • Wheels feature enhanced contour; slots are shot-peened for greater durability.

  • Distance piece uses a reverse-marriage joint for a robust interface with the compressor rotor.

  • Wheels and spacers machined from IN-718 forgings.

  • Firtree profile matches OEM for seamless use of EthosEnergy or third-party buckets.

GE 7FA.03 7FA.04 Unit FAQs

A new 7FA gas turbine rotor eliminates hidden fatigue and gives you a fresh 144,000 FFH / 5,000 FFS life clock, reducing forced-outage risk and lowering long-term maintenance spend

Yes - after an EthosEnergy engineering review, the compressor rotor swaps into any flared 7FA.03/.04 casing, and the turbine rotor aligns with Gen 4 enhanced-cooling-slot hardware.

Absolutely. We can install EthosEnergy or customer-provided buckets before shipment, or ship the rotor bucket-ready for installation on site.

The rotor meets or exceeds all pertinent TILs, including safety-critical TIL-1576, and is certified for the full OEM life of 144,000 FFH and 5,000 FFS.

With proper outage planning, most plants complete the rotor exchange during a standard major outage window—typically 7–10 days.

Reach our 7FA gas turbine specialists at enquiries@ethosenergygroup.com or via the contact form below for a customized quotation and current delivery timeline.

Yes, we offer a fleet-wide exchange program that lets you cycle rotors through planned outages, minimizing downtime and aligning capital outlay with your maintenance schedule.

The rotor ships on a dedicated skid measuring 28′ 0″ × 7′ 6″ and weighs roughly 96,000 lb (plus a 10,000 lb skid), fitting within standard heavy-haul permit limits.

EthosEnergy offers a comprehensive warranty covering workmanship and materials for the certified service interval; extended coverage and long-term service agreements are available.

We machine wheels and spacers from proven OEM alloys such as IN-718 and NiCrMoV, ensuring durability under 7FA gas turbine firing temperatures and stresses.

Contact us

Whether you have a question about our services or capabilities, or how we can help you solve a challenge, we’d love to hear from you.

What can we help you with today?

LIVE - EDIT