GE 7FA.03 7FA.04 Unit Rotor (New)
If your Frame 7FA rotor is approaching its service limit, secure worry-free operation with a brand-new 7FA rotor certified for up to 144,000 Factored Fired Hours (FFH) and 5,000 Factored Fired Starts (FFS). Reverse-engineered and refined by EthosEnergy’s turbine experts, the 7FA.03/.04 compressor and turbine rotors employ proven OEM designs and materials for peak reliability.
- Category
- Gas Turbines
- Model
- 7FA.03/.04
- OEM
- General Electric
Equipment Specifications
If your 7FA gas turbine rotor is nearing end-of-life, upgrade to a brand-new assembly certified for 144,000 FFH and 5,000 FFS.
EthosEnergy’s gas turbine experts have reverse-engineered and enhanced the design using proven OEM materials and superior alloys for the Frame 7FA.03/.04 compressor and turbine rotors.
Each compressor rotor ships fully bladed and is interchangeable with 7FA.03/.04 flared units, while turbine rotors arrive bucket-less (with optional bucket installation on request) and match the Gen 4 enhanced-cooling-slot equivalent.
Dimensions: 28' 0" x 7' 6"
Approx. Shipping Weight: 96,000 lb (rotor); 10,000 lb (skid)
Title | GE 7FA.03/7FA.04 Unit Rotor |
---|---|
Condition | New |
Total Running Hours | 0 |
Expected Rotor Life (FFH) | 144000 |
---|---|
Warranty Type | EcoLife™ |
Place of Dispatch | Houston, Texas, USA |
Enquire
Compressor Rotor
-
Fully bladed, balanced, and compatible with Frame 7FA.03/.04 units (subject to EthosEnergy engineering review).
-
Interchangeable with flared compressor rotors for these frames.
-
Fully inspected and balanced to prudent-industry standards.
-
Stages 12-17 compressor wheels redesigned per OEM TIL 1971/1972 to address field issues; wheels machined from proven alloys.
-
EthosEnergy-manufactured (or OEM-equivalent) round-bottom blades eliminate the need for spacers in stages R12-R17.
-
Optimal clocking and improved mesh order enhance performance and durability.
-
Individual bladed wheels are balanced before assembly; the full rotor is assembled in a state-of-the-art repair shop, with all quality certificates available on request.
-
Proprietary bi-layer coating applied to the stage 17 wheel for improved inner-barrel HPP-seal performance.
-
Applicable OEM TILs (1576, 1972, 1901, etc.) implemented; a summary is included in the detailed rotor-assembly report.
Turbine Rotor
-
Compatible with Frame 7FA.03/.04 units (subject to EthosEnergy engineering review) and supplied as Gen 4 design equivalent.
-
Stages 1-3 turbine wheels and 1-2/2-3 spacers engineered to resolve OEM-TIL issues.
-
Lock-wire-tab cracking and cooling-slot cracking addressed through improved design.
-
Wheels feature enhanced contour; slots are shot-peened for greater durability.
-
Distance piece uses a reverse-marriage joint for a robust interface with the compressor rotor.
-
Wheels and spacers machined from IN-718 forgings.
-
Firtree profile matches OEM for seamless use of EthosEnergy or third-party buckets.
GE 7FA.03 7FA.04 Unit FAQs
A new 7FA gas turbine rotor eliminates hidden fatigue and gives you a fresh 144,000 FFH / 5,000 FFS life clock, reducing forced-outage risk and lowering long-term maintenance spend
Yes - after an EthosEnergy engineering review, the compressor rotor swaps into any flared 7FA.03/.04 casing, and the turbine rotor aligns with Gen 4 enhanced-cooling-slot hardware.
Absolutely. We can install EthosEnergy or customer-provided buckets before shipment, or ship the rotor bucket-ready for installation on site.
The rotor meets or exceeds all pertinent TILs, including safety-critical TIL-1576, and is certified for the full OEM life of 144,000 FFH and 5,000 FFS.
With proper outage planning, most plants complete the rotor exchange during a standard major outage window—typically 7–10 days.
Reach our 7FA gas turbine specialists at enquiries@ethosenergygroup.com or via the contact form below for a customized quotation and current delivery timeline.
Yes, we offer a fleet-wide exchange program that lets you cycle rotors through planned outages, minimizing downtime and aligning capital outlay with your maintenance schedule.
The rotor ships on a dedicated skid measuring 28′ 0″ × 7′ 6″ and weighs roughly 96,000 lb (plus a 10,000 lb skid), fitting within standard heavy-haul permit limits.
EthosEnergy offers a comprehensive warranty covering workmanship and materials for the certified service interval; extended coverage and long-term service agreements are available.
We machine wheels and spacers from proven OEM alloys such as IN-718 and NiCrMoV, ensuring durability under 7FA gas turbine firing temperatures and stresses.
Rotor life extension solutions
Proven and reliable end of life solutions for aging fleets, including heavy duty gas turbine frame B, E, and F class as well as mature Westinghouse units. EthosEnergy’s solutions have been engineered to meet or exceed the original equipment manufacturer and the recommended end of life.