Extending Frame 7FA Gas Turbine Life Without the Risk
Heavy-duty gas turbine components have finite lifespans, and exceeding design limits risks costly forced outages. The rotor faces extreme temperatures and stresses, making its integrity critical for safe, reliable performance. GE’s TIL 1576 sets strict rotor life limits, requiring inspection or retirement at specific fired hours and starts. Operators must plan ahead to avoid downtime and ensure compliance.
This white paper delivers a proven solution for rotor end-of-life challenges, detailing the design, manufacturing, and installation of a new Frame 7FA.03/.04 rotor. Backed by decades of engineering expertise, it offers insights to extend turbine life safely and cost-effectively.
Download the White Paper "Extending the Life of Frame 7FA Gas Turbines: EthosEnergy Design &
Manufacturing Approach for New Rotors" below.
Emergency Gas Turbine Repairs: Three Outages, One Trusted Partner
When a major US utility was hit with three high-stakes turbine outages across multiple plants during the busiest outage season in years, EthosEnergy mobilised within days, deployed expert crews, and delivered complex repairs under extreme time pressure – keeping downtime to a minimum and protecting the client’s revenue during peak demand.