Skip to content

GE Gas Turbine Spare & Replacement Parts Supplier

Reliable new and refurbished gas turbine replacement parts and hardware designed for GE heavy-duty frame turbines, including frame 3, frame 5, frame 6B, frame 7E / EA, frame 7F, and frame 9.

Reliable new and refurbished gas turbine replacement parts and hardware designed for GE heavy-duty frame turbines, including frame 3, frame 5, frame 6B, frame 7E / EA, frame 7F, and frame 9.

GE Heavy-Duty Gas Turbine Spare & Replacement Parts — Rapid Supply for Maintenance & Outage Emergencies

Proactive outage planning begins with locking in OEM-quality GE heavy-duty gas-turbine spare and replacement parts before the work-scope starts. EthosEnergy stocks a global inventory of Frame 3, 5, 6B, 7EA/FA and 9E/F hot-gas-path components—buckets, nozzles, shrouds, transition pieces, liners and more—each 100 % interchangeable with the original GE design, new or expertly refurbished.

Because we are an independent parts supplier, you get rapid availability, competitive pricing and full traceability without compromising warranty or performance. All parts ship with material certs and dimensional inspection reports that meet or exceed OEM specifications.

Need something fast? Use the Parts Quick-Search above or call our 24 / 7 hotline; our engineers will locate the exact spare, refurbished or even serviceable-used component you need to keep your turbine on-line. For unexpected trips, we can mobilise emergency stock from regional hubs and arrange same-day courier or AOG freight to minimise downtime.

Trust EthosEnergy to extend the life of your GE unit—planned maintenance or unplanned outage, we deliver the parts that keep megawatts flowing.

USE OUR PARTS QUICK SEARCH

1st, 2nd & 3rd Stage Buckets (blades)
1st, 2nd & 3rd Stage Nozzles (vanes)
1st, 2nd & 3rd Stage Shrouds

Liners
Flow sleeves
Transition pieces

Primary fuel nozzles
Secondary fuel nozzles

Gas turbine parts and components to meet your deadlines

Our extensive inventory includes new gas turbine parts, as well as refurbished and used serviceable components, providing cost-effective options aligned with both your operational needs and project deadlines. Our history of gas turbine repair and refurbishment includes over 100,000 components with over five million hours in run time.

Along with our extensive inventory of gas turbine parts, we also hold stocks of new spare parts to meet planned and unplanned maintenance or outage requirements.

Inventory

  • 1st, 2nd & 3rd Stage Buckets
  • 1st, 2nd & 3rd Stage Nozzles
  • 1st, 2nd & 3rd Stage Shrouds
  • and much more!

Application

  • Suitable for natural gas and liquid fuel
  • Suitable for base or peak load operation at a rated firing temperature of up to 2055°F / 1124°C
  • Operation in accordance with GER-3620

Frame Types:

  • Frame 3, Frame 5, Frame 6B, Frame 7E / EA, Frame 7F, Frame 9 

Ready-to-Ship GE Gas-Turbine Parts & Components — New, Refurbished, Serviceable to Meet Any Deadline

With over 100,000 GE heavy-duty gas-turbine parts—validated by five-million+ run-time hours—EthosEnergy delivers the right component exactly when your maintenance schedule demands it. Our global inventory covers:

Factory-new spare parts for planned majors and hot-gas-path inspections.

OEM-equivalent refurbished parts that cut cost without sacrificing performance.

Serviceable-used components that bridge unexpected trips and budget gaps.

All parts—buckets, nozzles, shrouds, transition pieces and more for Frames 3 through 9E/F—are fully traceable, dimensionally inspected and ready for same-day dispatch from regional hubs. Whether you’re planning a shutdown months out or battling an unplanned outage right now, our 24 / 7 team aligns price, lead-time and logistics to hit your deadline and keep megawatts online. Use the Parts Quick-Search or speak directly with an engineer to lock in the spares that keep your turbine running.

SEND US YOUR ENQUIRY

Looking for a GE gas turbine part?

Use our quick search service to find the GE heavy duty gas turbine parts you need. 

Our gas turbine facilities

As your partner for global turbine services, EthosEnergy runs dedicated industrial gas-turbine facilities in the US, UAE and Europe. Each center delivers full-scope gas-turbine maintenance and repair services - from hot-gas-path overhauls to component life-extension - on GE, Fiat Avio and Westinghouse frames.

Our worldwide footprint means rapid parts availability, shorter outage cycles and predictable costs, so you can keep every capital component in service for its full life and maximise return on investment.

Gas turbine parts FAQs

A typical GE heavy-duty turbine HGP kit includes Stage 1–3 buckets/blades, nozzles, shrouds, transition pieces, liners, seals and hardware. EthosEnergy stocks OEM-equivalent parts for Frames 3, 5, 6B, 7EA/FA and 9E/F so you can lock in all critical components ahead of your planned outage.

For most high-run-rate items—buckets, fuel nozzles, transition pieces—we can release from regional hubs within 4 hours of order, with same-day courier or AOG air-freight options. Average door-to-door delivery for North America and Europe is 24–48 hours, minimising outage downtime.

Yes. Each refurbished part is strip-inspected, NDE-tested, dimensionally restored and coated to GE spec before final QA. Serviceable-used parts undergo boroscope and FPI checks to verify remaining life. Both categories carry up to 18-month warranties and full traceability.

Absolutely. Every new or refurbished component ships with material certificates, dimensional inspection reports and metallurgical data that meet or exceed OEM standards, plus a 12- to 36-month parts warranty depending on the item. 

Use our Parts Quick-Search—enter the drawing or serial number from your TIL or parts list—or send your turbine model, serial and stage/location to our engineering desk. We cross-reference GE master part lists to confirm the exact bucket, nozzle or shroud number and any superseded revisions.

Yes. We maintain a global exchange pool and employ reverse-engineering and additive-manufacturing routes for discontinued Frame 3–9 components. If we don’t have stock, we can usually manufacture or locate an approved substitute within 2–6 weeks.

Send us your parts enquiry

If you are looking for a particular part and need assistance finding it, reach out to our team now. We're here to help. 

Fields marked with an asterisk (*) are required
0 / Characters remaining
LIVE - EDIT